3rd. Floor MRI project
Dalton, GA
H2 Services demolished an existing unused CT suite and provided all required construction, including installation of the R/F shielded enclosure, for the required MRI scan, control and equipment rooms. Along with construction services, H2 provided additional professional support including architectural and structural engineering design along with assisting with the Certificate of Need application. Also included in this work was the required roof modifications and structural support to place the MRI chiller unit on the roof above the work space. Since the only way to place the MRI into the facility was by removal of a portion of the exterior wall of the facility, H2 provided the required equipment, materials and personnel to remove the precast concrete wall panels, rig the MRI into place and then reinstall the wall panels.